随公路、铁路、城市道路建设项目不断扩大,公司建筑市场逐步扩大都需要用到混凝土,而混凝土搅拌车是常见的施工设备,但使用过程中出现的问题也不算少,比如设备抱轴问题。我们来分析下。
With the continuous expansion of highway, railway and urban road construction projects, the company's construction market is gradually expanding need to use concrete, and concrete mixer is a common construction equipment, but the use of the process of problems are not less, such as equipment axle problems. So let's analyze it.
混凝土搅拌车抱轴的原因:
Reasons for holding the shaft of concrete mixer truck:
搅拌机抱轴是由于在搅拌过程中粉料、砂石和液体混合所形成的粘结物,黏附在搅拌轴和搅拌臂上,日积月累在其表面形成一层非常厚且不易清理的粘结物。
The agitator holds the shaft because in the process of mixing powder, sand and liquid formed by the mixture of adhesives, adhesion to the mixing shaft and the mixing arm, accumulated over a long period of time on its surface to form a layer of very thick and difficult to clean the adhesives.
混凝土搅拌车抱轴的危害:
Harm of concrete mixing truck holding shaft:
混凝土搅拌车厂家认为影响混凝土的质量,搅拌机抱轴后打出的混凝土搅拌不均匀。增加了混凝土搅拌车的负载,耗能增大。影响耐磨件、轴端密封的寿命,加快耐磨件的磨损,抱轴后搅拌臂磨损非常严重,使用寿命大大缩短。
Concrete mixer manufacturer thinks that the quality of concrete is affected, and the concrete produced after the mixer holds the shaft is not evenly mixed. The load of concrete mixer is increased and the energy consumption is increased. It affects the life of wear-resistant parts and shaft end seal, speeds up the wear of wear-resistant parts, and the wear of the stirring arm after holding the shaft is very serious, and the service life is greatly shortened.
防止混凝土搅拌车抱轴的方法:
Methods to prevent the concrete mixer from holding the shaft:
调整喂食顺序和时间。骨料和粉料预先混合后落入主机(但骨料必须先下一部分),使粉料在一定程度上附着在骨料上,减少落入主机的粉料。提高搅拌轴和搅拌臂的搅拌效率是可能的,也是可能的。
Adjust feeding order and time. The aggregate and powder are pre-mixed and then fall into the host (but the aggregate must be part of the next), so that the powder is attached to the aggregate to a certain extent, reducing the powder falling into the host. It is possible and possible to improve the mixing efficiency of the mixer shaft and the mixer arm.
主盖水管中心线要求与搅拌轴中心线在同一垂直平面内,搅拌臂与搅拌轴夹角上方有直喷喷嘴。因为搅拌臂与转轴的夹角是最容易粘胶的地方,所以通常从搅拌臂根部开始抱轴。同时,始终需要加水的时间。
The center line of the water pipe of the main cover shall be in the same vertical plane as the center line of the mixing shaft, and there shall be a direct spray nozzle above the Angle between the mixing arm and the mixing shaft. Because the Angle between the stirring arm and the rotating shaft is the easiest place to stick, the shaft is usually held from the root of the stirring arm. Also, it always takes time to add water.
搅拌出料后,设备操作人员应及时清洗、冲洗罐体,以确保清除粘附的混凝土。设备操作人员应定期检查计量系统中计量桶的连接和密封情况,注意是否有泄漏,如有则及时排除。
After mixing and discharging, equipment operators should clean and flush the tank in time to ensure the removal of adhesive concrete. Equipment operators should periodically check the connection and sealing of the metering barrels in the metering system to check whether there is leakage. If there is leakage, remove it in time.
当您在使用混凝土搅拌车的过程中遇到抱轴现象,一定要及时查明具体原因,以便快速解决,以免影响您的正常工作。更多相关文问题就来网站咨询吧!
When you encounter the phenomenon of holding the axle in the process of using the concrete mixer, you must find out the specific reason in time, so as to solve it quickly, so as not to affect your normal work. More related questions come to website consultation!